国产美女一级性大黄片_办公室国产a国产片免费_av夜夜躁狠狠躁日日躁_亚洲欧洲一级456

&
 
  網(wǎng)站首頁(yè) 公司簡(jiǎn)介 產(chǎn)品展示 工程展示 行業(yè)新聞 人才招聘 在線咨詢 聯(lián)系我們
 
 LED series
 Moving head light series
 Film and theatre lighting series
 Follow light series
 Outdoor light series
 Fog machines
 Strobe light series
 Stage light series
 Laser light series
 Controller series
 accessories series
 
News content
Commissioning of stage lamps
Source:ANDY         Time:2019-2-22 9:42:57

Carefully check whether the external connection of each stage lamp is correct and whether the appearance is a new machine.

Carefully check the running status of the single machine and the overall operating condition.

The technical requirements of the stage lighting fixture shall strictly comply with the requirements of the contract.

Completed in the project and need to check over computer network dimming Taiwan and the running speed of the computer console lights and the scene of lamps and lanterns, computer lights, color changer, hood and other online controlled equipment action response time is consistent, computer lights, color changer, hood self check whether it is normal to wait, and should pay attention to the lighting system and sound system and video system each other without interference, if, record generated interference time and specific equipment models, in order to facilitate the future to solve.

12.7 overall debugging

When all the projects have been completed, and all the equipments are in good condition, no obvious debugging is not, then the whole system is debugged. The main task is to check whether they have mutual influence and interfere with each other, and check whether they can interfere with the sound system.

12.8 system simulation test run

All the equipment commissioning is completed, the simulation process must be carried out before the system is officially running, because indoor theater lighting system of Beijing overseas Chinese town Happy Valley complex, the state is not the same, debugging in a short time in the project, it is difficult to discover the hidden or insufficient, but once after the completion of the project, the president of the running time of the system is much more practical, and often over time, overload phenomenon, then the system already exists and it is not found the problems and issues, it is possible to rapidly expand, bring adverse effects to both you and the engineering, simulation run is in quasi running environment, understand the working conditions, the system finds the problem, nip in the bud.

First of all, to use the current meter on each item of the device to run and the overall operation of the power supply line of the current. Although in the design and construction on the supply line of corresponding requirements, a general understanding of the current distribution of each phase, but the actual operation and theoretical value will have access to, in order to accomplish know fairly well, foolproof, must the current situation of actual operation were measured.

By using current meter to measure the number of different time and operation equipment, if there is a big gap between the actual measurement value and theoretical value, or the difference of the proportion of each phase current is large, or the line current is abnormal, it is necessary to make a new reform in order to ensure the safety.

Second, to check the full load operation of the full load operation and the working stability of the long running time.

Finally, check the heating conditions of the equipment at full load operation and long running time.

Lighting system equipment is basically power equipment, in the operation will certainly have different degrees of fever, especially in the case of the load, computer lights and other large power equipment, the heating situation is more obvious, so to a certain extent, the heating phenomenon, will not affect the safety of equipment and systems, equipment. However, if in the installation did not retain the appropriate space for heat dissipation, or equipment itself in a long time, heavy load operation of the heat, it should be solved, otherwise mild equipment protection, caused severe damage to the device. Normal operating range of equipment, heating, must be replaced; if there is no suitable heat dissipation space and equipment heat, it should be considered when forced ventilation, and to clearly tell the owners, regular cleaning and equipment maintenance.

Because the simulation is very important and very necessary, then the work will be the stability and safety of the system. The heating condition of the power supply line and the equipment will be directly related to the safety of the project, so it must be highly valued by all engineering technicians.

Because the lighting project to debug, set up and check the project, and this result and problem is the future use and maintenance of important reference materials, so it is necessary to carry out each step will be the results and problems recorded, and then carry out the necessary analysis and summary. For the user to record data, it should be handed over to them; for the future maintenance of useful records data, stage lighting equipment should be properly kept by the designer. The results of the record include: the position number of the equipment, the setting of the equipment, the test data, the information of the related programs, etc..

Completion and acceptance of the project is a large military parade throughout the system, is a comprehensive experience of the quality of the whole project, its significance, so the process of its acceptance and acceptance of the requirements is relatively important, will be part of the contents of the following brief

 Previous: What is the advantage of the 280W beam
 Next: Development trend of stage lighting
  Links
 
About Us | News | Recruitment | Advisory | Contact Us
All rights reserved:Guangzhou Andy
粵ICP備17021536號(hào)-1